600MW亚临界机组高压加热器失效分析及改造 被引量:1

Failure Analysis of the HP Heater used in the 600 MW Sub-critical Power Plant and Replacement of the Equipment
下载PDF
导出
摘要 通过对某电厂1号机3号高压加热器自投产以来的U形管泄漏进行统计、分析,探讨引起换热U形管失效的种种因素,提出了高压加热器更换改造的方案。 This paper mainly focus on the U-tube leakage of No.3 HP-heater of No.1 Unit in some power plant, which started to fail since its commissioning andnearly several times every year. Through the statistics and analysis of the failure data, we can discuss various factors leading to the failure of the tubes and point out the only solution to fix this problem is to replace the HP heater.
作者 朱永葆 Zhu Yongbao(Hebei Datang International Wangtan Power Generation Co.,Ltd.,Tangshan 063610,Hebei,China)
出处 《电站辅机》 2022年第3期28-32,共5页 Power Station Auxiliary Equipment
关键词 高压加热器 换热管泄漏 失效分析 更换改造 HP heater tube leakage failure analysis replacement of the equipment
  • 相关文献

参考文献2

二级参考文献7

  • 1杨昆 顾煜炯.设备维修理论与技术[M].,2001..
  • 2水利电力部.火力发电厂高压加热器运行维护守则[M].北京:水利电力出版社,1983..
  • 3DL/T793-2003.发电设备可靠性评价规程[S].[S].,..
  • 4刘爱忠主编.汽轮机设备及运行[M]. 中国电力出版社, 2003
  • 5朱新华主编.电厂汽轮机[M]. 中国电力出版社, 2000
  • 6陈去恶主编.汽轮机设备及运行[M]. 中国电力出版社, 1997
  • 7洪钧,王利平,刘虹.国产 200MW 机组高压加热器热经济性估算方法[J].华北电力技术,1998(11):50-52. 被引量:1

共引文献3

同被引文献23

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部