摘要
通过对金乡县曹庄橡胶坝施工中遇到的导流问题进行分析,在充分考虑现场地形条件、主体工程布置和施工进度安排等各种因素下,施工中采取了分段围堰的方法,综合设计施工导流方案成功地控制了施工水流,给橡胶坝重建施工创造干地条件,效果较好。
Based on the analysis of diversion problems encountered in the construction of rubber dam in Caozhuang,it adopted a segment of the cofferdam construction method,fully considering the terrain conditions,the principal part of the project layout and construction schedule arrangement of various factors.The comprehensive design construction diversion scheme is successful in controlling the construction flow and creating a dry condition to the reconstruction of rubber dam effectively.
作者
周春华
ZHOU Chunhua(Water Resources Development Center,Water Resources Bureau of Jinxiang County,Jinxiang,Shandong 272000,China)
出处
《山东水利》
2022年第11期31-33,共3页
Shandong Water Resources
关键词
金乡县
曹庄橡胶坝
导流方法
围堰设计
Jinxiang County
Caozhuang rubber dam
Flow diversion method
Design of the cofferdam