南京过江隧道大直径盾构机在岩石段掘进及带压换刀期间的泥水管理技术研究 被引量:1

A study on the mud management techniques of the large shield machine of Nanjing Cross River Tunnel during the excavation of rock sections and the tool change under pressure
下载PDF
导出
摘要 本文结合南京某过江隧道大直径泥水盾构机在岩石段掘进施工及带压换刀期间,根据不同工况下泥水指标需求不同,需要频繁置换以满足掌子面稳定,因此重点研究在泥水频繁置换下的泥水管理技术,分析在岩石段掘进及带压换刀期间遇到的问题,总结泥水管理经验,为后续长距离复杂地层隧道泥水式盾构泥水管理提供借鉴及相关参考。 This paper combines the construction of a large-diameter shield machine in a tunnel across the river in Nanjing during the excavation of the rock section and the tool change under pressure.Due to the different mud index requirements under different working conditions,the mud needs to be replaced frequently to meet the stability of the Heading Face in Tunnel Excavation.Therefore,this paper focus on mud management technology under frequent mud replacement,analyze the problems encountered during rock section boring and tool change with pressure,summarize mud management experience,and provide reference for mud management in subsequent long distance mud-water shield tunnels with complex strata.
作者 刘新新 Xinxin Liu(Xuzhou Metro Group Co.Ltd.,Xuzhou 221000,China)
出处 《青海交通科技》 2021年第6期143-147,共5页 Qinghai Transportation Science and Technology
关键词 岩石掘进 带压换刀 泥水管理 rock Excavation tool change with pressure mud Management
  • 相关文献

参考文献11

二级参考文献85

共引文献123

同被引文献12

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部