期刊文献+

抽水蓄能电站基建期双重预防体系建设与实践 被引量:2

Construction and practice of dual prevention system in construction period of pumped storage power station
下载PDF
导出
摘要 通过阐述现阶段水利建设施工过程中安全管理存在的问题及不足,介绍双重预防体系中危险源的概念以及危险源、风险、隐患、事故之间的关系,呈现双重预防体系的建设内容,以潍坊抽水蓄能电站为例,分别论述风险分级管控和隐患治理的具体内容,对施工准备阶段、实施阶段进行全面风险辨识,并利用LEC安全风险评估方法确定风险大小和等级,制定风险管控措施和隐患排查治理措施,实现水利工程建设项目的风险动态闭环管控。 This paper expounds the problems and shortcomings of safety management in the process of water conservancy construction at present,introduces the concept of hazard source,the relationship among hazard source,risk,hidden danger and accident,and the construction content of the dual prevention system.Taking Weifang Pumped Storage Power Station as an example,it discusses the specific content of risk management and control and hidden danger control respectively,and carries out comprehensive risk identification in the construction preparation stage and implementation stage,and uses LEC safety risk assessment method to determine the risk size and grade.Finally,it formulates risk management and control measures and hidden danger investigation and control measures.
作者 王闯 刘福月 张建威 Wang Chuang;Liu Fuyue;Zhang Jianwei(Shandong Weifang Pumped Storage Co.LTD,Weifang,Shandong)
出处 《吉林水利》 2023年第1期60-64,共5页 Jilin Water Resources
基金 国网新源山东潍坊抽水蓄能电站双重预防体系建设服务,合同编号:SGXYWF00JHJS2200029。
关键词 双重预防体系 风险 隐患 LEC安全风险评估方法 dual prevention system hidden risk and danger LEC safety risk assessment method
  • 相关文献

参考文献10

二级参考文献30

共引文献69

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部