摘要
结合地铁工程项目实例,着重分析盾构法施工工艺,包括地层加固措施、盾构机始发与到达掘进控制措施等方面。在全面的规划之下,有条不紊地推进施工进程,各项工作有效落实到位,盾构施工效果良好,可充分发挥出盾构法在地铁工程中的应用优势。
This paper analyzes the construction technology of shield tunneling method based on the example of subway project,including stratum reinforcement measures,starting and arriving tunneling control measures of shield tunneling machine.Under the comprehensive planning,the construction process is pushed forward methodically,all work is effectively implemented in place,and the shield construction effect is good,which can give full play to the advantages of the application of shield tunneling method in subway engineering.
作者
任光跃
REN Guang-yue(Crcc Chongqing Investment Group Co.Ltd.,Chongqing 400000,China)
出处
《工程建设与设计》
2022年第22期121-123,共3页
Construction & Design for Engineering
关键词
地铁工程
盾构法
地层加固
控制措施
subway project
shield method
stratum reinforcement
control measures