摘要
以某矿拟开采的采区为例,分析采区的地质条件和开采现状,确定采用骨架式充填采煤方案,通过技术、充填材料来源以及经济上分析,确定村庄下骨架式充填开采具有一定的可行性。
Taking the mining area to be mined in a mine as an example, the geological conditions and mining status of the mining area are analyzed, and the skeleton filling mining scheme is determined. Through technical, filling material source and economic analysis, it is determined that the skeleton filling mining under the village is feasible.
作者
刘辉
LIU Hui(Shandong Jingrun Engineering Research and Design Co.,Ltd.,Rizhao 276800,China)
出处
《价值工程》
2023年第4期80-82,共3页
Value Engineering
关键词
村庄下采煤
充填开采
骨架式充填
可行性
mining under villages
backfill mining
skeleton filling
feasibility