期刊文献+

基于长期监测的盾构连续穿越复合多样性地层衬砌变形研究 被引量:1

Lining deformation in composite and diverse strata under continuous shield tunneling based on long-time monitoring
下载PDF
导出
摘要 文章依托广州地铁工程的长期监测数据,对于盾构施工连续穿越复合多样性地层的衬砌变形进行了分析。54组净空收敛、拱顶沉降数据表明本工程穿越砾岩、含砾砂岩等地层时,拱顶沉降、净空收敛最大分别为-9.4 mm和-8.6 mm;穿越砾岩、含砾砂岩等地层时,拱顶沉降、净空收敛最大分别为-4.1 mm和-4.5 mm;不同区段的监测最大值均小于本工程的拱顶沉降、净空收敛预警值与控制值。文章分析结果表明,本工程施工控制较为良好,可为类似工程提供参考。 Based on the long-term monitoring data of Guangzhou metro project, this paper analyzes the deformation of the lining of the shield tunneling through the complex and diverse strata. 54 groups of clearance convergence and vault settlement data show that when the project passes through conglomerate, pebbly sandstone and other strata, the maximum clearance convergence and vault settlement are-9.4 and-8.6 mm, respectively. When crossing conglomerate, pebbly sandstone and other strata, the maximum arch settlement and clearance convergence are-4.1 and-4.5 mm, respectively. The maximum monitoring values of different sections are less than the arch settlement, clearance convergence warning value and control value of the project. The analysis results show that the construction control of this project is relatively good, which can provide reference for similar projects.
作者 连杰 韩馨茹 曾爱军 李炜明 吴政 Lian Jie;Han Xinru;Zeng Aijun;Li Weiming;Wu Zheng(School of Civil Engineering and Architecture,Wuhan Polytechnic University,Wuhan 430023,China;Guangzhou Metro Co.,Ltd.,Guangzhou 510330,China;China Railway 22 nd Bureau Group Rail Engineering Co.,Ltd.,Beijing 100040,China)
出处 《江苏科技信息》 2023年第5期73-76,80,共5页 Jiangsu Science and Technology Information
关键词 复合地层 盾构施工 施工监测 拱顶沉降 净空收敛 composite strata shield construction construction monitoring vault settlement clearance convergence
  • 相关文献

参考文献7

二级参考文献35

共引文献393

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部