摘要 为解决块段式煤层所导致资源浪费问题,在对1#煤层长壁式开采方式残留的煤层进行开采,对所属工作面地质、煤层等条件分析的基础上,结合连续块段式开采工艺完成了巷道的合理布置,并通过理论计算和经验初步确定煤柱宽度,最后通过数值模拟手段对煤柱宽度进行优化,达到工作面安全开采效果的同时,最大化提升了资源回收率。 In order to solve the problem of resource waste caused by block type coal seam,on the basis of mining the residual coal seam of1#coal seam longwall mining method,analyzing the geological and coal seam conditions of the working face,and combining the continuous block type mining technology,the reasonable layout of the roadway was completed,and the coal pillar width was initially determined through theoretical calculation and experience,and finally the coal pillar width was optimized by numerical simulation,while achieving the safe mining effect of the working face,the resource recovery rate is maximized.
作者 郭二斗 Guo Erdou(No.1 Mine of Huayang Group Co.,Ltd.,Yangquan Shanxi 045000)
机构地区 华阳集团一矿
出处 《山西化工》 2023年第2期121-122,134,共3页 Shanxi Chemical Industry
关键词 连续采煤机 块段式煤层 煤柱宽度 资源回收率 顶板管理 continuous shearer block coal seam coal pillar width resource recovery rate roof management
  • 相关文献

参考文献5

二级参考文献40

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部