基于PHA-FTA的组塔高处作业事故分析 被引量:3

Accident Analysis of Tower Assembly Operation at Height Based on PHA-FTA
下载PDF
导出
摘要 基于PHA-FTA进行线路组塔高处作业事故的原因分析,确定事故发生的主要原因为违规作业、安全意识淡薄、作业人员缺乏相关资质、工器具未检查以及负责人指挥错误,并提出相对应的防范措施,提升线路组塔施工工程的安全管理水平。 Based on PHA-FTA,the cause of overhead operation accidents during line tower assembly is analyzed,and it is determined that the accident is mainly caused by illegal operation,weak safety awareness,lack of relevant qualifications of operators,non-inspection of tools and instruments as well as wrong command of the responsible person.The corresponding preventive measures are proposed so as to improve the safety management level of line tower assembly construction project.
作者 陈俊杰 白立泉 CHEN Junjie;BAI Liquan(Shibei Power Supply Company,Shanghai 200072;Shanghai Power Transmission and Transformation Engineering Co.,Ltd.,Shanghai 200235)
出处 《电力安全技术》 2023年第3期42-45,共4页 Electric Safety Technology
关键词 高处作业 线路组塔 预先危险法 事故树分析法 危险性元素 work at height line tower assembly advanced hazard law fault tree analysis dangerous elements
  • 相关文献

参考文献2

二级参考文献10

共引文献5

同被引文献19

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部