深度调峰工况下某汽轮机异常振动原因分析 被引量:5

Analysis of Abnormal Vibration of a Steam Turbine under Deep Regulation Condition
下载PDF
导出
摘要 某发电厂3号机为600MW超临界机组,在一次机组正常调峰运行过程中,发生了振动增大导致的非计划停运事件。通过对振动数据进行分析,判断高中压轴封位置发生严重碰摩,导致高中压转子轴振增大。碰摩原因为轴封联络管中冷汽进入,导致轴封位置发生碰摩故障。对深度调峰工况下轴封温度对机组振动的影响进行了详细的分析,为今后类似机组在调峰状态下振动故障的分析提供了借鉴。 An unplanned outage occurred in a 600MW supercritical unit with No.3 unit in a power plant due to the increase of vibration during a normal peaking operation of the unit.By analyzing the vibration data,it is judged that the shaft vibration of the high and medium pressure rotor increases because of the serious rubbing of the shaft seal.The reason of rub-impact is that the cold steam in the connecting pipe of the shaft seal enters,which leads to rub-impact fault of the shaft seal.In this paper,the influence of shaft seal temperature on the vibration of units under deep peaking condition is analyzed in detail,which lays a foundation for the vibration fault analysis of similar units under peaking condition in the future.
作者 李立波 张凯波 LI Li-bo;ZHANG Kai-bo(Datang Northeast Electric Power Test Research Institute,Changchun 130012,China;Datang Tuoketuo Power Generation Co.,Ltd.,Tuoketuo 010200,China)
出处 《汽轮机技术》 北大核心 2023年第1期74-76,共3页 Turbine Technology
关键词 600MW机组 碰摩 调峰 轴封 600MW unit impact-rubbing peak-shaving shaft-seal
  • 相关文献

参考文献4

二级参考文献20

共引文献27

同被引文献68

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部