期刊文献+

考虑交货期的双资源柔性作业车间节能调度 被引量:4

Dual Resource Constrained Flexible Job Shop Energy-saving Scheduling Considering Delivery Time
原文传递
导出
摘要 为解决含有机器和工人双资源约束的柔性作业车间节能调度问题,在考虑交货期的基础上,建立了以总提前和拖期惩罚值及总能耗最小为目标的双资源柔性作业车间节能调度模型。提出了一种改进的非支配排序遗传算法(improved non-dominated sorting genetic algorithmⅡ,INSGA-Ⅱ)进行求解。针对所优化的目标,设计了一种三阶段解码方法以获得高质量的可行解;利用动态自适应交叉和变异算子以获得更多优良个体;改进拥挤距离以获得收敛性和分布性更优的种群。将INSGA-Ⅱ与多种多目标优化算法进行对比分析,实验结果表明所提算法可行且有效。 To handle the flexible job shop energy-saving scheduling with machines and workers constraints,on the considering of delivery time,the optimization model of dual resource constrained flexible job shop energy-saving scheduling is established with the goal of minimizing the total earliness and tardiness penalties,and total energy consumption.An improved non-dominated sorting genetic algorithm II(INSGA-II)is proposed.Aiming at the optimized objectives,a three-stage decoding method is designed to gain more feasible solutions.The dynamic adaptive crossover and mutation operators are applied to get more excellent individuals.The crowding distance is improved to obtain a population with better convergence and distribution.The result of comparing INSGA-II with several other multi-objective optimization algorithms,verifies the feasibility and effectiveness of the proposed algorithm.
作者 张洪亮 徐静茹 谈波 徐公杰 Zhang Hongliang;Xu Jingru;Tan Bo;Xu Gongjie(Key Laboratory of Multidisciplinary Management and Control of Complex Systems of Anhui Higher Education Institutes(Anhui University of Technology),Ma'anshan 243032,China;School of Management Science and Engineering,Anhui University of Technology,Ma'anshan 243032,China;School of Intelligent Manufacturing Engineering,Ma'anshan University,Ma'anshan 243100,China)
出处 《系统仿真学报》 CAS CSCD 北大核心 2023年第4期734-746,共13页 Journal of System Simulation
基金 国家自然科学基金面上项目(71772002) 安徽普通高校重点实验室开放基金重点项目(CS2021-ZD01) 安徽省自然科学基金(2008085QG335)。
关键词 双资源约束 柔性作业车间 提前/拖期惩罚 能耗 INSGA-Ⅱ(improved non-dominated sorting genetic algorithmⅡ) dual resource constrains flexible job shop earliness/tardiness penalties energy consumption INSGA-Ⅱ(improved non-dominated sorting genetic algorithm Ⅱ)
  • 相关文献

参考文献14

二级参考文献98

  • 1肖世昌,吴自高,孙树栋,金梅.双资源约束的鲁棒Job Shop调度问题研究[J].机械工程学报,2021,57(4):227-239. 被引量:7
  • 2张超勇,饶运清,李培根,邵新宇.柔性作业车间调度问题的两级遗传算法[J].机械工程学报,2007,43(4):119-124. 被引量:105
  • 3鞠全勇,朱剑英.多目标批量生产柔性作业车间优化调度[J].机械工程学报,2007,43(8):148-154. 被引量:64
  • 4樊坤,张人千,夏国平.基于改进BPSO算法求解一类作业车间调度问题[J].系统工程理论与实践,2007,27(11):111-117. 被引量:8
  • 5GOREN S,SABUNCUOGLU I.Optimization of schedule robustness and stability under random machine breakdowns and processing time variability[J].IIE Transactions,2009,42(3):203-220.
  • 6CHENG T C E.Optimal common due date with limited completion time deviation[J].Computer and Operations Research,1998,15 (2):91-96.
  • 7GU J,GU M,CAO C,et al.A novel competitive co-evolutionary quantum genetic algorithm for stochastic Job-Shop scheduling problem[J].Computers & Operations Research,2010,37(5):927-937.
  • 8AZADEH A,NEGAHBAN A,MOGHADDAM M.A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic Job-Shop scheduling problems[J].International Journal of Production Research,2012,50 (2):551-566.
  • 9MARJAN V D A,KEVIN V B,HAN H.Finding robust solutions for the stochastic Job-Shop scheduling problem by including simulation in local search[M]//Experimental Algorithms.Berlin,Gerrnany:Springer-Verlag,2013:402-413.
  • 10HU Y,YIN M,LI X.A novel objective function for Job-Shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm[J].The International Journal of Advanced Manufacturing Technology,2011,56(9/10/11/12):1125-1138.

共引文献154

同被引文献34

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部