期刊文献+

基于伯努利能量方程河道洪水位设计及护岸分析 被引量:1

Design of river flood level and analysis of bank protection based on Bernoulli energy equation
下载PDF
导出
摘要 以太平河河道整治工程为例,为推求天然河道沿程设计洪水位,以稳定非均匀流为计算依据,按伯努利能量方程对河道水位进行推求,并对该河岸的护岸设计方法进行了分析研究。研究结果表明,采用伯努利能量方程依次往上推算水面线,符合水面线推算原则,计算得出的水面线结果均在合理范围内。通过分析护岸设计方案,松木桩的抗剪、抗弯能力差,易折断,且松木桩方案投资相比C60仿木桩方案高,因此C60仿木桩更适合本工程的河道护岸。 Taking the Taiping River regulation project as an example,in order to calculate the design flood level along the natural river course,the water level of the river course is calculated according to Bernoulli energy equation based on the calculation of stable non-uniform flow,and the bank protection design method of the river bank is analyzed and studied.The results show that the calculation of water surface line by Bernoulli energy equation is in accordance with the principle of water surface line calculation,and the calculated results of water surface line are within a reasonable range.Through the analysis of the bank protection design scheme,the pine pile is poor in shear and bending ability,easy to break,and the investment of pine pile scheme is higher than that of C60 imitation pile scheme,so C60 imitation pile is more suitable for the river bank protection of this project.
作者 张岩 孙强国 张志闯 张健 张波 ZHANG Yan;SUN Qiangguo;ZHANG Zhichuang;ZHANG Jian;ZHANG Bo(Huaigao Water Conservancy Service Station in Huaiyin District,Huai’an 223300,China;Gaojiayan Water Conservancy Service Station in Huaiyin District,Huai’an 223300,China;Jiangsu Xintong Engineering Project Management Co.,Ltd.,Huai’an 223003,China;Huiyin District Activity Dam Water Conservancy Management Office,Huai’an 223300,China;Huaiyin District Water Conservancy Bureau,Huai’an 223300,China)
出处 《江苏水利》 2023年第4期24-27,共4页 Jiangsu Water Resources
关键词 河道整治 能量方程 洪水位设计 护案结构 river regulation energy equation flood level design bank protection structure
  • 相关文献

参考文献11

二级参考文献89

共引文献21

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部