期刊文献+

基于TSD的沥青路面结构性能评价方法研究 被引量:1

Research on Evaluation Method of Asphalt Pavement Structure Performance Based on the TSD
下载PDF
导出
摘要 弯沉是道路结构性能评价的重要指标,交通速度弯沉仪(TSD)是一种能够连续、快速获取路面动态弯沉的新型无损检测工具。为了更好地推动TSD的发展与应用,首先,在明确TSD的测量原理及计算方法的基础上,结合检测数据,分析了TSD检测的可重复性及与贝克曼梁(BB)的相关性;其次,探讨了TSD检测的影响因素,并重点分析了行驶速度对弯沉的影响;最后,结合弯沉差TSD_(300)指标,对测试路段进行了结构性能评价。研究成果为快速无损评价路面结构性能提供了支撑,并为道路的养护与管理提供了更高效、经济的发展方向。 Deflection is an important index for the evaluation of asphalt pavement structure.Traffic Speed Deflectometer(TSD)is a new type of nondestructive testing tool that can continuously and rapidly obtain the dynamic deflection of the road surface.To better promote the development and application,the repeatability of TSD testing and the correlation with Beckman Beam(BB)were analyzed based on clarifying the measurement principle and calculation method of TSD combined with the test data.The factors influencing TSD detection were discussed and the influence of driving speed was emphatically analyzed.Combined with the TSD_(300) index,the structural performance of the test section was evaluated.The research results provided support for rapid nondestructive evaluation of pavement structure performance and a more efficient and economic development direction for road maintenance and management.
作者 高文堃 童晓莹 程怀磊 GAO Wenkun;TONG Xiaoying;CHENG Huailei
出处 《上海公路》 2023年第1期1-7,M0003,共8页 Shanghai Highways
关键词 沥青道路 交通速度弯沉仪 贝克曼梁 行驶车速 结构性能评价 asphalt pavement traffic speed deflection meter beckman beam driving speed structural performance evaluation
  • 相关文献

参考文献5

二级参考文献25

  • 1李莉.路面技术状况快速检测设备综述[J].公路交通科技(应用技术版),2009,5(9):44-46. 被引量:5
  • 2王宏畅,黄晓明,傅智.半刚性基层表面裂缝影响因素[J].交通运输工程学报,2005,5(2):38-41. 被引量:38
  • 3谷晓旭,王选仓,李芳.公路路面质量控制检测现状及评价[J].华东公路,2007(3):43-46. 被引量:7
  • 4钟阳,孙爱民,周福霖,张永山.变速移动荷载作用下弹性地基梁的动态反应[J].沈阳建筑大学学报(自然科学版),2007,23(5):776-779. 被引量:4
  • 5Weligamage J, Piyatrapoomi N, Gunapala L. Traffic speed deflectometer: Queensland trial[J]. Queensland Roads, 2010(9): 16-27.
  • 6Baltzer S, Pratt D, Weligamage J. Continuous bear- ing capacity profile of 18,000 km Australian road net- work in 5 Months[C]//24th ARRB Conference-Build- ing on 50 Years of Road and Transport Research. Mel bourne, Australia: ARRB, 2010: 1-11.
  • 7Krarup J, Rasmussen S, Aagaard L, et al. Output from the greenwood traffic speed deflectometer[C]// ARRB Conference, 22ND, 2006, Canberra, Austral- ia: IFRTD, 2006: 1-10.
  • 8Hildebrand G. Development of a high speed ddlecto- graph[J] Nordic Road and Transport, 2002, 14(3): 17-23.
  • 9Rada R, Daleiden F, Thomas Y. Moving pavement deflection testing measurements [ C] // CONINFRA 2010-4~ Transportation Infrastructure Conference. Brasil: iSMARTi, 2010: 1-16.
  • 10Rasmussen S, Baltzer S, Aagaard Pedersen L, et al. A comparison of two years of network level measure- ments with the traffic speed deflectometer[C],//Sec- ond European Road Transport Research Arena. Lju- bljana, Slovenia: ERTRAC, CEDR, 2008:1-8.

共引文献14

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部