期刊文献+

面向综合能源园区的丰枯电价定价方法 被引量:2

Pricing Method for Season of Use in Integrated Energy Park
下载PDF
导出
摘要 综合能源园区是以新能源为主体的新型电力系统的基本单元,通过建设分布式电源,可以实现能源生产、消费就近完成和园区自我平衡。通过挖掘用户需求响应潜力,制定差异化丰枯电价,能够缓解分布式电源出力和用户电量的季节性不匹配矛盾,对此提出一种面向综合能源园区的丰枯电价定价方法。首先,根据用户的电量特征和需求响应特征,基于k-means聚类算法进行用户分类;然后,根据园区不平衡电量,基于k-means聚类算法划分丰枯时段;最后,构建优化模型,制定不同类别用户的丰枯电价。根据案例分析可知,基于该方法制定丰枯电价,能够有效促进分布式电源就地消纳,提高园区清洁能源消费比重和整体经济性。 Integrated energy park is the basic unit of new electric power system dominated by renewable energy.Depending on distributed generators,the energy production and consumption nearby and self-balance of park are achieved.The contradiction of seasonal load mismatch between distributed generators and users can be released by tapping demand response potential and stipulating different season of use(SOU)price.A pricing method for SOU price in integrated energy park was put forward accordingly.First of all,considering characteristics of load and demand response,users were classified by k-means clustering algorithm.Then,according to unbalance load of park,SOU periods were determined by k-means clustering algorithm.At last,the optimization model was established to stipulate SOU price of different types of users.As the case shown,based on this method,SOU price can promote local consumption of distributed generators efficiently and raise the utilization ratio of clean energy and overall economic benefit of park.
作者 杜将武 唐小强 罗志伟 刘敦楠 陈积旭 徐尔丰 毕圣 DU Jiangwu;TANG Xiaoqiang;LUO Zhiwei;LIU Dunnan;CHEN Jixu;XU Erfeng;BI Sheng(Fujian Branch,China Huadian Corporation Ltd.,Fuzhou 350001,Fujian Province,China;Fujian Huadian Energy Retail Co.,Ltd.,Fuzhou 350001,Fujian Province,China;Huadian(Fujian)Wind Power Co.,Ltd.,Fuzhou 350001,Fujian Province,China;School of Economics and Management,North China Electric Power University,Changping District,Beijing 102206,China;Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,Zhejiang Province,China;Zhejiang Zheneng Energy Service Co.,Ltd.,Hangzhou 310002,Zhejiang Province,China)
出处 《发电技术》 CSCD 2023年第2期261-269,共9页 Power Generation Technology
基金 国家社科基金重大项目(19ZDA081) 中国华电集团有限公司科技项目(CHDKJ20-02-05)。
关键词 新型电力系统 综合能源园区 分布式电源 丰枯电价 K-MEANS聚类 需求响应 new power system integrated energy park distributed generator season of use price k-means clustering demand response
  • 相关文献

参考文献25

二级参考文献392

共引文献1470

同被引文献45

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部