从沈白高铁隧道“8·15”火灾扑救浅析隧道救援应急通信保障对策 被引量:1

Discussion on Emergency Communication Guarantee Measures for Tunnel Rescue in the“8.15”Fire Suppression in the Shenbai High Speed Railway Tunnel
下载PDF
导出
摘要 本文在调研复盘沈白高铁在建隧道“8·15”火灾扑救案例基础上,实地测试并探索总结了消防救援队伍在隧道灾害事故中通信保障的问题短板,从现场通信组织、通信组网、通信手段和完善联动机制等方面,提出了加强隧道救援应急通信保障的对策和要点,为推动和规范“三断”极端条件下的应急通信保障能力建设提供一定借鉴和参考。 Based on the investigation and review of the“8.15”fire rescue case of the under-construction tunnel in Shenbai high-speed railway,through field test and exploration,this thesis concludes the shortcomings of communication support of fire rescue team in tunnel disasters and accidents,and provides the countermeasures and key points of strengthening emergency communication support of tunnel rescue were put forward from the aspects of field communication organization,communication networking,communication means and improving coordinating mechanism,which provided a reference for promoting and standardizing the building of emergency communication support capacity under the extreme conditions of“three breaks”.
作者 严恩泽 YAN Enze
出处 《中国应急救援》 2023年第3期63-67,共5页 China Emergency Rescue
关键词 隧道救援 应急通信 保障对策 tunnel rescue emergency communication guarantee measures
  • 相关文献

参考文献6

二级参考文献19

共引文献25

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部