3×210MW燃煤电厂湿法脱硫装置增容改造方案设计

Design of Capacity-increasing and Rehabilitation for Wet Desulfurization Unit in 3×210 MW Coal-fired Power Plant
下载PDF
导出
摘要 以土耳其某3×210 MW煤粉锅炉的湿法脱硫装置增容改造为例,介绍了为适应土耳其国内日益严格的环保标准及响应业主要求,通过对比吸收塔拆除重建、吸收塔及其辅助系统改造、单塔双循环、双塔双循环四种改造方案,得出了吸收塔及其辅助系统改造方案最适合本项目。并提出吸收塔及其辅助系统改造的具体方案设计,可为类似燃煤电厂湿法脱硫装置增容改造项目提供参考。 The capacity-increasing and rehabilitation of a 3×210 MW pulverized coal boiler in Turkey is taken as an example,and introduces,in order to adapt to the increasingly strict environmental protection standards in Turkey and respond to the requirements of the owner,by comparing the removal and reconstruction of the absorption tower,the absorption tower and its auxiliary systems According to the four transformation schemes of transformation,single-tower double-circulation and double-tower double-circulation,it is concluded that the transformation scheme of the absorption tower and its auxiliary system is the most suitable for this project.And put forward the specific scheme design for the transformation of the absorption tower and its auxiliary systems,which can provide a reference for the capacity expansion and transformation projects of the wet desulfurization unit in similar coal-fired power plants.
作者 胡信韬 陈雨欢 王操 彭义林 HU Xintao;CHEN Yuhuan;WANG Cao;PENG Yilin(Hubei Electric Engineer Co.Ltd.,Wuhan 430000,China)
出处 《工业加热》 CAS 2023年第4期73-76,共4页 Industrial Heating
关键词 增容改造 湿法脱硫 吸收塔 环保标准 capacity-increasing wet desulfurization absorption tower environmental protection standard
  • 相关文献

参考文献11

二级参考文献42

共引文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部