摘要
在湿陷性黄土地区,常规方法设置检漏井及检漏管沟,容易造成建筑物外检查井盖数量过多,严重影响室外景观效果,不利于垃圾焚烧发电厂的日常维护管理。垃圾焚烧发电厂内给排水系统管道相比于一般民用建筑,其管道系统种类更多,系统干管更加集中,支管更加分散。针对其特点,提出设置综合检漏管沟的工程方案,并考虑其他辅助工程措施,以便在实际运行中的管理,避免管道损漏影响正常生产。
In collapsible loess area,the conventional method of setting leak detection well and leak detection trench is easy to cause the number of inspection well covers outside the building,which seriously affects the outdoor landscape effect,it is not conducive to the daily maintenance and management of waste incineration power plant.Compared with common civil buildings,the water supply and drainage system pipelines in waste incineration power plants have more kinds of pipeline systems,the main pipe of the system is more concentrated,and the branch pipe is more dispersed.According to its characteristics,the engineering scheme of setting comprehensive leak detection trench is put forward,and other auxiliary engineering measures are considered,so as to facilitate the management of actual operation and avoid pipeline leakage affecting production.
作者
仇琛程
QIU Chencheng(Nanchang Urban Planning&Design Research Institute,Nanchang 300038)
出处
《福建建筑》
2023年第4期136-139,共4页
Fujian Architecture & Construction
关键词
湿陷性黄土
检漏井
检漏管沟
防护距离
垃圾焚烧发电厂
Collapsible loess
Leak detection well
Leak detection pipe ditch
Protection distance
Waste incineration power plant