期刊文献+

挣值管理在项目完工预测中的应用与改进:研究综述 被引量:1

Application and Improvement of Earned Value Management in Project Completion Prediction:A Review
下载PDF
导出
摘要 通过文献研究,对现有应用挣值管理进行项目完工预测的研究进行综述,从改进绩效指数的准确性与集成风险因素的影响两个角度进行系统性梳理,总结现有研究的优势与局限性,以期为未来研究指明方向。 Through literature research,this study reviewed the existing researches on project completion prediction using earned value management,systematically sorted out the accuracy of improved performance index and the influence of integrated risk factors,and summarized the advantages and limitations of the existing researches in order to point out the direction for future research.
作者 廖伟 宁延 Liao Wei;Ning Yan(School of Management and Engineering,Nanjing University,Nanjing 210093,China)
出处 《科技管理研究》 CSSCI 北大核心 2023年第11期185-190,共6页 Science and Technology Management Research
基金 国家自然科学基金面上项目“组态视角下全过程工程咨询多主体协同治理研究”(71872039),“全生命周期视角下基础设施项目价值共创研究:目标、行为及治理”(72271118)。
关键词 挣值管理 项目完工预测 研究综述 earned value management project completion forecast research overview
  • 相关文献

参考文献4

二级参考文献30

  • 1汪应洛,杨耀红.多合同的激励优化与最优工期确定[J].预测,2005,24(2):60-63. 被引量:41
  • 2周晓宏.项目管理中的挣值管理方法研究——兼与戚安邦同志商榷[J].数量经济技术经济研究,2005,22(4):143-148. 被引量:25
  • 3长青,吉格迪,李长青.项目绩效评价中挣值分析方法的优化研究[J].中国管理科学,2006,14(2):65-70. 被引量:75
  • 4ALAN WEBB. A Guide to project manager~Using earned value[M]. Surrey : Gower,2003.
  • 5DENIS F CIOFFI. Designing project management: A scientific nota-tion and an improved formalism for earned value calculations [ J]. In-ternational Journal of Project Management, 2006 (24) : 136-144.
  • 6K H ROSE. Review of earned value project management [ J]. ProjectManagement Journal,2003,31 (1): 234 -241.
  • 7JOSEPH A LUKAS. Earned value analysis: Why it doesn ’ t work[J]. AACE International Transactions, 2010 ( 1 ) : 1—10.
  • 8ROBERT A MARSHAL. The contribution of earned value managementto project success on contracted efforts [ J ]. Journal of Contract Man-agement ,2009 (Summer) : 21 -33.
  • 9PAUL J SOLOMON. Integrating systems engineering with earned valuemanagement [ J]. Defense AT&L. , 2011 (5-6): 41 -45.
  • 10RAY W STRATTON. Applying earned schedule analysis to EVM datafor estimating completion date [ J ]. AACE International Transac-tions, 2008 (4) : 1 -3.

共引文献13

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部