复杂地质条件工作面贯通测量设计及实践 被引量:1

Design and practice of through survey of working face under complex geological conditions
下载PDF
导出
摘要 1402工作面多断层发育,地质条件复杂,沿煤层顶板掘进巷道在长距离贯通时可能因断层影响而造成贯通误差大。针对此问题,结合相关地质资料,制定专项贯通测量方案,经2次独立贯通测量数据分析及贯通误差预计估算,贯通精度可靠。 Due to the development of multiple faults in the 1402 working face and complex geological conditions,the driving roadway along the roof of the coal seam may cause large penetration errors due to the influence of faults.In view of this problem,Xintian Coal Mine has developed a special through survey plan combined with relevant geological data.Through two independent through survey data analyses and through error estimation,the accuracy is reliable.
作者 刘东亮 冯飞 LIU Dongliang;FENG Fei(Xintian Coal mine,Yonggui Energy Co.,Ltd.,Bijie 551700,China;Gaoshan Coal mine,Yonggui Energy Co.,Ltd.,Bijie 551700,China)
出处 《技术与市场》 2023年第7期96-98,102,共4页 Technology and Market
关键词 贯通测量 复杂地质条件 误差预计 精度 through measurement complex geological condition error prediction accuracy
  • 相关文献

参考文献7

二级参考文献38

共引文献14

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部