摘要
苏州轨道交通6号线中新大道西站附属结构施工面临110 kV输电管沟无法迁改、220 kV输电架空线横跨基坑净空低需要保护等难题,极大地制约着工程顺利推进。本研究阐述了110 kV、220 kV高压输电管线现场保护措施,介绍了其关键技术,可为后续类似工程施工提供借鉴和参考。
The auxiliary structure construction of Zhongxindadao West Station of Suzhou Rail Transit Line 6 involves such problems as impossible relocation of the 110 kV transmission pipe trench and protection of 220 kV overhead transmission lines due to low clearance above the pit,which greatly restricted the construction progress.This study elaborates on on-site protective measures for 110 kV and 220 kV high-voltage transmission lines and introduces key technologies for reference in similar engineering construction in the future.
作者
赵金华
牛运君
李嘉盛
王丁红
郭朋飞
张国利
ZHAO Jin-hua;NIU Yun-jun;LI Jia-sheng;WANG Ding-hong;GUO Peng-fei;ZHANG Guo-li(Suzhou Rail Transit Group Co.,Ltd.,215000,Suzhou,Jiangsu,China;BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2023年第15期1844-1846,共3页
Architecture Technology
关键词
轨道交通
输电线路
施工现场保护
rail transit
transmission line
construction site protection