青岛特钢2号高炉快速降料面停炉实践

Practice of Quick Reduction Surface Shutdown of Qingdao Special Steel No.2 Blast Furnace
下载PDF
导出
摘要 介绍了青岛特钢2号高炉停炉前的准备工作、快速降料面的控制原则和具体操作措施。降料面操作过程中,风量、顶温、顶压等关键操作参数控制得当,炉内无爆震、无管道气流、无悬料,风口无烧损、无灌渣,整个过程历时16 h,顺利将料面降至风口以下,26个风口全部露出,实现安全、高效、环保停炉。 This article introduces the preparation work before the shutdown of Qingdao Special Steel's No.2 blast furnace,the control principles and specific operational measures for rapid material reduction surface.The key operating parameters such as air volume,top temperature,and top pressure are properly controlled duringtheprocess oflowering thematerial surface.There is no detonation,no pipeline air flow,or suspended material in the furnace,and there is no burning loss or slag filling in the tuyere.The entire process takes 16 hours,and the material surface is smoothly lowered below the tuyere.All 26 tuyeres are exposed,achieving safe,efficient,and environmentally friendly furnace shutdown.
作者 吴艺鹏 刘玉猛 闫洪义 孙晓飞 孙旭东 WU Yipeng;LIU Yumeng;YAN Hongyi;SUN Xiaofei;SUN Xudong(Qingdao Special Steel Co.,Ltd.,Qingdao 266200,China)
出处 《山东冶金》 CAS 2023年第4期58-59,62,共3页 Shandong Metallurgy
关键词 高炉 降料面 停炉 blast furnace lowering charge level blowing out
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部