期刊文献+

基于小水电的某乡镇10 kV微电网规划研究

Research on 1o kV Microgrid Planning in a Township Based on Small Hydropower
下载PDF
导出
摘要 偏远山区中压配网规划建设困难,导致地区网架薄弱、供电质量较差。以典型地区为例,分析10kV电网的基本情况及存在问题,以及光伏、水电等可再生能源资源情况和发电能力;根据负荷特性、电力负荷发展情况,利用当地既有小水电,规划新能源和储能系统形成乡镇级别的10 kV微电网,以提升当地的供电质量。 It is difficult to plan and construct medium voltage distribution network in remote mountainous areas,which leads to weak network frame and poor power supply quality.Taking a typical area as an example,the basic situation and existing problems of the 10 kV power grid,as well as renewable energy resources such as photovoltaic,hydropower and power generation capacity are analyzed.According to the load characteristics and power load development situation,the local existing small hydropower is used to plan the new energy and energy storage systems to form a township-level 10 kV micro-grid to improve the quality of local power supply.
作者 王朋朋 杜璇 张桐博 王爽 WANG Pengpeng;DU Xuan;ZHANG Tongbo;WANG Shuang(Shenyang Boying Electric Power Design Co.,Ltd.,Shenyang 110086,Shenyang Province,China;Shenyang New Youth Consulting Co.,Ltd.,Shenyang 110411,Shenyang Province,China)
出处 《电力与能源》 2023年第4期385-390,共6页 Power & Energy
关键词 微电网规划 小水电 新能源 储能 microgrid planning small hydropower new energy stored energy
  • 相关文献

参考文献5

二级参考文献83

  • 1LASSETER R. Smart distribution :coupled mierogrids [R ]. Procee- dings of the IEEE,2011,99(6) : 1074-1082.
  • 2FAN Mingtian,ZHANG Zuping,SU Aoxue. A planning approach for active distribution networks[C]//CIRED2011 21st International Conference on Electricity Distribution. Frankfurt, Germany :lET Services Ltd,2011 : 1-4.
  • 3AREFIFAR S A,MOHAMED Y A. Supply-adequacy-based optimal construction of microgrids in smart distribution systems [J]. IEEE Transactions on Smart Grid,2012,3(3):1491-1502.
  • 4al KAABI S S,ZEINELDIN H H,KHADKIKAR V. Planning active distribution networks considering multi-DG configurations [J]. IEEE Transactions on Power Systems,2014,99:1-9.
  • 5MARTINS V F,BORGES C L T. Active distribution network integrated planning incorporating distributed generation and load response uncertainties [Jl. IEEE Transactions on Power Systems,2011,26(4) :2164-2172.
  • 6KHODAYAR M E,BARATI M,SHAHIDEHPOUR M. Integration of high reliability distribution system in microgrid operation[J]. IEEE Transactions on Smart Grid,2012,3(4) : 1997-2006.
  • 7PILO F,PISANO G,SOMA G G. Optimal coordination of energy resources with a two-stage online active management[J]. IEEE Transactions on Industrial Electronics,2011,10(58) :4526-4537.
  • 8KAHROBAEIAN A,MOHAMED Y A. Interactive distributed generation interface for flexible micro-grid operation in smart distribution systems [Jl. IEEE Transactions on Sustainable Energy,2012,3(2) :295-305.
  • 9HU Z,LI F. Cost-benefit analyses of active distribution network management,part I:annual benefit analysis[J]. IEEE Transactions on Smart Grid,2012,3(3):1067-1074.
  • 10HU Z,LI F. Cost-benefit analyses of active distribution network management,part I :investment reduction analysis[J]. IEEE Tran- sactions on Smart Grid,2012,3(3):1075-1081.

共引文献166