摘要
某核电工程中的土建项目施工,结合实际情况,确定在此核电工程土建项目施工期间,选用组合式液压爬升模板施工技术。文章以该项目工程为例,对施工过程中所用的组合式液压爬升模板系统展开研究,阐述爬升模板系统的整体布设,对其中内筒蛙式爬升系统、外架附壁式液压爬模系统以及针对特殊位置的爬模系统的设计与施工应用进行分析。
In the civil engineering project construction of a nuclear power engineering,it is determined to use the combined hydraulic climbing formwork construction technology combined with the actual situation.Taking the project engineering as an example,this paper studies the combined hydraulic climbing formwork system used in the construction process,expounds the overall layout of the climbing formwork system,and analyzes the design and construction application of the inner tube frog climbing system,the outer frame wall-attached hydraulic climbing formwork system and the climbing formwork system for special positions.
作者
隋恒忠
SUI Hengzhong(China Nuclear Industry 22nd Construction Co.,Ltd.,Wuhan 430000,Hubei,China)
出处
《工程技术研究》
2023年第13期92-94,共3页
Engineering and Technological Research
关键词
核电工程
土建项目
组合式液压爬升模板系统
nuclear power engineering
civil engineering project
combined hydraulic climbing formwork system