隧道侧穿巨型溶洞施工处置技术研究 被引量:1

Study on Cavern Treatment during Tunnelling Crossing Huge Cavern on the Side
下载PDF
导出
摘要 隧道穿越巨型溶洞过程中的安全处置研究对于我国岩溶区隧道施工具有重要意义。依托于湖北某隧道,利用数值模拟和现场监测等手段对隧道侧穿巨型溶洞施工过程中的安全问题进行研究,从经济性、安全性等角度提出了“回填+注浆”的综合处置方法,数值模拟和现场监测均表明利用本文提出的“回填+注浆”的综合处置方法可有效控制衬砌结构变形,保障结构受力安全,整体处置效果良好。 For tunnelling in China's karst regions,the investigation of safety measures during tunnel crossing enormous caves is highly es-sential.This study examines safety during the construction of a side tunnel through a huge cavern using numerical simulation and field moni-toring based on a tunnel in Hubei.From an economic and safety standpoint,a thorough disposal strategy called"backfill+grouting"is sug-gested.The"backfill+grouting"measure can successfully regulate the deformation of the lining structure and ensure the safety of the struc-ture,according to numerical simulations and field monitoring.
作者 孙颐 蔡义 SUN Yi;CAI Yi(Hubei Communications Investment Construction Group Co.,Ltd.Wuhan 430070,China;Bridge and Tunnel Engineering Company,Hubei Communications Investment Construction Group Co.,Ltd.Wuhan 430070,China;Technical Research and Development Center,Hubei Communications Investment Construction Group Co.,Ltd.Wuhan 430070,China)
出处 《广东土木与建筑》 2023年第9期75-78,93,共5页 Guangdong Architecture Civil Engineering
关键词 隧道工程 巨型溶洞 溶洞处置 数值模拟 现场监测 方案比选 tunnel engineering huge cavern cavern treatment numerical simulation field monitoring scheme comparison.
  • 相关文献

参考文献13

二级参考文献123

共引文献113

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部