双碳目标的实施促使着抽水蓄能工程的大开发。长龙山抽水蓄能电站通过创新管理模式,大大提高监测单位与施工单位之间的沟通协作效率,降低了建设单位的管理与建设成本;采用先进、适宜的施工技术,不仅获得较优的施工质量,且充分发挥了监测数据反馈设计、指导施工、监控安全的作用。相关的管理模式与实施经验可供其他类似项目参考借鉴。
The implementation of the“carbon peaking and carbon neutrality”goals is promoting the large-scale development of pumped storage projects.In Changlongshan Pumped Storage Power Station,the management mode is innovated,which greatly improves the communication and collaboration efficiency between the monitoring units and the construction units,and reduces the management and construction costs of the construction units.Also,advanced and suitable construction techniques are adopted,which not only achieve superior construction quality,but also fully utilize the monitoring data on design feedback,construction guidance and safety monitoring.The experience in management mode innovation and implementation can be useful reference for similar projects.
作者
毛鹏
江志红
夏遵全
卞晓卫
周以林
何平
MAO Peng;JIANG Zhihong;XIA Zunquan;BIAN Xiaowei;ZHOU Yilin;HE Ping(Power China Guiyang Engineering Corporation,Guiyang 550081,China)
出处
《水电与新能源》
2023年第10期53-56,共4页
Hydropower and New Energy
关键词
长龙山抽水蓄能电站
安全监测管理
监测仪器保护
施工期监测自动化
Changlongshan Pumped Storage Power Station
safety monitoring management
monitoring instrument protection
monitoring automation during construction period