期刊文献+

南四湖二级坝泄量纠偏模型建设探讨

Discussion of discharge correction model for the Nansi Lake secondary dam
下载PDF
导出
摘要 南四湖二级坝枢纽是分泄南四湖上级湖洪水入下级湖的控制工程,为了解决闸门开启过程中可能出现的实际下泄流量与调度指令泄量误差较大的问题,论述了泄量纠偏模型知识库的构建内容,泄量纠偏模型构建和训练过程,以及应用流程和应用实践结果。该模型具有较强的数值模拟能力,可广泛应用于其他流域大型水闸工程,为水旱灾害防御提供决策支持。 The secondary dam junction of the Nansi Lake is a control project to discharge flood water from the upper lake into the lower lake,In order to solve the problem that there may be a large error between the actual discharge flow and the dispatch instruction discharge in the process of gate opening,the construction content of the discharge correction model knowledge base,the construction and training process of the discharge correction model,the application flow and the practical results are discussed.The model has strong numerical simulation ability,and can be widely used in large-scale sluice projects in other river basins to provide decision support for flood and drought disaster prevention.
作者 杜庆顺 于百奎 刘媛媛 刘业森 胡文才 金炎辉 Du Qingshun;Yu Baikui;Liu Yuanyuan;Liu Yesen;Hu Wencai;Jin Yanhui
出处 《中国水利》 2023年第20期59-62,共4页 China Water Resources
基金 水利部重大科技项目“全国通用流域产汇流及洪水预报模型”(SKR-2022056) “淮河流域智能洪水预报调度技术研究及应用”(SKR-2022031)。
关键词 南四湖二级坝 泄量纠偏 数字孪生工程 知识库 机器学习 the Nansi Lake secondary dam discharge correction digital twin project knowledge base machine learning
  • 相关文献

参考文献15

二级参考文献181

共引文献291

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部