期刊文献+

工作面前方支承压力分布情况的研究

Research on Abutment Pressure Distribution in Front of Working Face
下载PDF
导出
摘要 为探究综采工作面进入末采阶段时超前区域矿压显现规律,本文以某矿209综采工作面为研究对象,通过在顺槽距停采线100 m位置设置煤体应力实时监测,得出综采工作面末采时对超前区域的压力影响范围,为综采工作面回撤安全通道提供补强支护依据,也为大巷保护煤柱留设提供理论依据。 In order to explore the law of mine pressure behavior in the advanced area when the fully mechanized mining face enters the final mining stage,this article takes the 209 fully mechanized mining face of a mine as the research object.By setting up the real-time monitoring of coal stress at the position of 100 m from the stop line of the roadway,and obtains the pressure influence range of the advanced area at the final mining of the fully mechanized mining face,which is firstly to provide a reinforcement support basis for the retraction safety channel of the fully mechanized mining face.,and secondly to provide a theoretical basis for the protection of coal columns in the main roadway..
作者 田帅 刘如鹏 Tian Shuai;Liu Rupeng(Jingbao Coal Industry of Jinneng Holding Coal Group Co.,Ltd.,Changzhi Shanxi 046299;No.2 Coal Mine of Shanxi Huangling Co.,Ltd.,Yan'an Shanxi,727306)
出处 《晋控科学技术》 2023年第5期17-19,25,共4页 Jinneng Holding Science and Technology
关键词 综采工作面 末采 钻孔应力计 应力 Fully mechanized working face Final mining Borehole stressmeter Stress
  • 相关文献

参考文献5

二级参考文献19

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部