摘要
引水钢岔管作为抽水蓄能电站重要的水工建筑物,体型复杂,制作难度大。介绍了清原引水钢岔管打压试验原理、方法及过程,验证了钢岔管体型设计及焊缝接头的可靠性,通过试验前后的无损检测,消除了新钢岔管的部分残余应力。结果证明,引水钢岔管质量有保证,能满足运行期各个工况下的安全运行。
As an important hydraulic structure for pumped storage power station,the shape of steel bifurcated pipe is complex and the production is difficult.The principle and process of Qingyuan Steel Bifurcated Pipe are introduced.The reliability of the shape design and weld joints of the steel bifurcated pipe are verified.Some residual stresses of the new steel bifurcated pipe are eliminated through non-destructive testing before and after the experiment.The result show that the quality of the diversion steel bifurcated pipe is guaranteed and can work safely under various working conditions during the operation period.
作者
张一鸣
钱玉英
宋蕊香
ZHANG Yiming;QIAN Yuying;SONG Ruixiang(Power China Beijing Engineering Corporation Limited,Beijing 100024,China)
出处
《水利水电技术(中英文)》
北大核心
2023年第S02期67-72,共6页
Water Resources and Hydropower Engineering
关键词
钢岔管
水压试验
抽水蓄能电站
steel bifurcated pipe
hydraulic test
pumped storage power station