摘要 作为核电站主泵电机的核心电驱设备,变频调速设备一旦出现故障,就会对生产及其相关工艺造成十分严重的后果。鉴于此,本文提出一种变频器双机冗余驱动方案,通过两台变频器驱动一台电动机来实现变频器整机的冗余备份,当驱动电动机的主变频器出现故障时,可在较短时间(150ms)内自动切换至备用变频器驱动输出,确保电动机能够连续稳定运行。这种双机冗余切换方案可为核电站的稳定运行提供重要保障,降低潜在风险。 As the core electric drive for the primary pump motor in a nuclear power plant,any fault of the frequency converter can cause extremely serious consequences for production and related processes.This paper presents a redundant drive scheme for inverters.Two inverters are used to drive one motor to provide redundant backup for the whole inverter.When the main inverter device driving the motor fails,it can automatically switch to the backup inverter drive output in a short time(within 150ms)to ensure that the motor can run continuously and stably.This dual-machine redundant switching scheme provides an important guarantee for the stable operation of the nuclear power plant and reduces potential risks.
作者 王宪坤 伍星 宋文科 李彪 竺伟 WANG Xiankun;WU Xing;SONG Wenke;LI Biao;ZHU Wei(Shandong Nuclear Power Co.,Ltd,Haiyang,Shandong 265116;Shanghai Nancal Electric Co.,Ltd,Shanghai 201413)
出处 《电气技术》 2023年第11期76-80,共5页 Electrical Engineering
关键词 变频器 双机冗余 切换时间 电动机 frequency converter dual converter redundancy switching time motor
  • 相关文献

参考文献10

二级参考文献70

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部