期刊文献+

H-4连接器解锁故障分析与应对

H-4 Connector Unlocking Fault Analysis and Response
下载PDF
导出
摘要 文章对H-4水下连接器的相关知识进行较为详尽的介绍,通过对其主要功能部件——锁紧环的受力分析,揭示了连接器能够用较低控制压力对较高井眼压力实现密封的原因。通过对其另一功能部件——锁块的受力分析,揭示了连接器出现解锁故障的本质原因。结合其它理论和计算,对两个典型案例中的现象进行解析。提出H-4连接器解锁故障的应对措施、应对建议、预防措施,供相关从业者参考和借鉴。 This paper introduces the related knowledge of H-4 subsea connector in detail.Through the force analysis of its main functional component'locking ring',the reason that the connector can seal the higher wellbore pressure with lower control pressure is revealed.Through the force analysis of another functional component'latch segment',the essential reason for the unlocking failure of the connector is revealed.Combined with other theories and calculations,the phenomena in the two typical cases are explained.Finally,the solutions,treatment suggestions and preventive measures for the unlocking failure of H-4 connector are put forward for the reference of relevant practitioners.
作者 符新涛 巨礼文 伦庆宇 安伦 申磊 刘义 FU Xintao;JU Liwen;LUN Qingyu;AN Lun;SHEN Lei;LIU Yi(SINOPEC Offshore Oilfield Engineering Company Shanghai Drilling Division,Shanghai 201206,China)
出处 《海洋石油》 CAS 2023年第4期107-112,共6页 Offshore Oil
关键词 水下连接器 受力分析 典型案例 分析 应对 subsea connector force analysis typical cases analysis response
  • 相关文献

参考文献5

二级参考文献32

  • 1陈家庆.海洋油气开发中的水下生产系统(一)[J].石油机械,2007,35(5):54-58. 被引量:53
  • 2Sanjay K Reddy.Oceaneering Intervention Engineer-ing,B.Mark Paull,Kerr-McGee Corporation,Bjorn E.HaIs,Oceaneering International Services Ltd.Diver-less Hard-Pipe Connection Systems for Subsea Pipe-lines and Flowlines[C]//Offshore Technology Confer-ence Proceedings,OTC Paper No.7269,May 1996.
  • 3FMC Technologies.Torus Tie-in System[EB/OL].(2011-11-13)[2011-11-13].http://www.fmctechnologies.com/en/SubseaSystems/Technologies/SubseaProductionSys-tems/TieInAndFlowlines/VerticalAndHorizontalTieIn-Systems/VerticalTieIn/TorusTie.aspx.
  • 4GE Energy.DG and DG-2mandrel connector system[EB/OL].(2011-11-13)[2011-11-13].http://www.ge-energy.com/products_and_services/products/sub-sea_trees_manifolds_and_connection_systems/DG_and_DG-2_Mandrel_Connector_System.jsp.
  • 5Peter M Roberts.Reducing Lost Time between Explorationand Production of Deepwater Oil&Gas Fields:The contri-bution from Diverless Connector Selection[Z].
  • 6Giovanni Corbetta,David S Cox.Deepwater Tie-Ins ofRigid Lines:Horizontal Spool or Vertical Jumper[Z].
  • 7McKeehan D S,Freet T G.DeeDwater Flowline Tie-insand Jumpers:What works best[C]//Offshore Tech-nology Conference Proceedings,OTC Paper No.7269,May 1993.
  • 8Andrew Jefferies.Deep Sea Development Services Inc.Gemini Subsea System Design[C]//Offshore Tech-nology Conference Proceedings.OTC Paper No.11866,May 2000.
  • 9漆安慎,力学基础,1982年
  • 10郝桐生,理论力学,1965年

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部