期刊文献+

南昌绿地朝阳中心结构设计若干关键问题 被引量:3

Some key problems in structural design of Nanchang Greenland Chaoyang Center
下载PDF
导出
摘要 南昌绿地朝阳中心4-1#楼结构大屋面高度195.80m。在做到整体结构安全、适用、经济的前提下,着重考虑了一些结构关键部位的细节设计,如核心筒竖向收进处,除在构造上采取过渡措施外,通过弹塑性分析进一步找出结构薄弱部位,并针对性地给出了加强配筋等措施;针对常规的型钢混凝土梁柱节点采用了一种新型的双梁节点,以便于施工,并通过节点有限元分析证明了其受力传递的可靠性;对核心筒连梁采取一拆为二的双连梁方式,既能保证一定的结构刚度,又便于管线敷设,保证建筑净高;对框架柱与地下室外墙交接处混凝土强度等级不同的问题,给出了一种二次浇筑的节点做法。 The structural large roof height of the 4-1#building in Nanchang Greenland Chaoyang Center is 195.80m.On the premise of ensuring the safety,applicability and economy of the overall structure,the detailed design of some key parts of the structure were focused,for example,on the floor of the vertical shrinkage of the core tube,in addition to taking structural transitional measures,the weak parts of the structure through elastic-plastic analysis were further identified and targeted reinforcement measures were provided;a new type of double beam joint was used for the conventional joint of the SRC column and beam to facilitate construction,and the reliability of the force transfer was proved by finite element analysis of the joint;The core tube spandrel was divided into two,which not only could ensure a certain structural stiffness,but also facilitate pipeline laying and ensure the building’s clear height;to solve the problem of different strength grades of concrete at the junction of frame column and basement wall,a joint method of secondary pouring was given.
作者 余志伟 YU Zhiwei(Shanghai Urban Architecture Design Co.,Ltd.,Shanghai 200439,China)
出处 《建筑结构》 北大核心 2023年第23期57-62,共6页 Building Structure
关键词 超高层 核心筒竖向收进 型钢混凝土梁柱节点 双连梁 二次浇筑 细节设计 super high-rise building vertical shrinkage of core tube joint of SRC column and beam double spandrel secondary pouring detail design
  • 相关文献

参考文献5

二级参考文献25

  • 1练贤荣,黄俊海,王卫忠.某工程的楼板应力分析[J].建筑结构,2011,41(S1):658-660. 被引量:11
  • 2GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 3GB50010-2010混凝土结构设计规范[S].北京:中国建筑工程出版社,2011.
  • 4JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 5GB5001l-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 6RWDI.苏州工业园区271地块超高层项目风洞试验研究[R].2010.
  • 7ASCE/SEI 41-06 Seismic rehabilitation of existing buildings [ S ] Washington, D. C. : American Society of Civil Engineers, 2006.
  • 8本格尼S塔拉纳.高层建筑钢、混凝土、组合结构设计[M].罗福午,译.北京:中国建筑工业出版社,1999.
  • 9Azuma Y. Ito M, Harada Y, et al. Low-intensity pulsed ultrasound accelerates rat femoral fracture healing by acting on the various cellular reactions in the fracture callus. J Bone Miner Res 2001; 16:671-80
  • 10Latyshev V P,Kaliberdo L M,Popova N I.[J]Kinet.Katal.,1965,6:167-168

共引文献24

同被引文献22

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部