摘要
深中通道工程项目位于珠江中下游核心区域,其本身融合了多种交通集群为一体,总体技术水平要求较高。西人工岛作为深中通道的重要一环,其蕴含桥隧转换的重要技术。文章主要从其设计和重要技术等方面进行研究,本次研究为深海大型人工岛的建设提供设计与技术参考。
The Shenzhen-Zhongshan River-crossing Link,situated in the core area of the Pearl River's middle and lower reaches,requires a high level of technical expertise due to its integration of multiple transportation clusters.This study focuses on the West Artificial Island,an important component of the river-crossing project,and explores its design and significant technologies related to bridge-tunnel conversion.This research offers design and technical insights for constructing large artificial islands in deep-sea environments.
出处
《江苏建材》
2023年第6期50-52,57,共4页
Jiangsu Building Materials
基金
广东省重点领域研发计划项目(2019B111106002)。
关键词
人工岛
总体设计
有限元分析
artificial island
overall design
finite element analysis