摘要
机电设备安装是地铁施工项目的重要分项工程,关乎地铁基础设施后续运行状态,因此,需做好地铁设备安装作业的施工管理。基于此,本文选用案例研究法,选取某地铁机电设备工程为实例展开分析,简要总结该工程存的施工重难点问题,进一步从图纸审查、BIM技术、组织管理、施工管理4个角度分析地铁机电设备安装工程施工管理要点,以供相关行业技术人员参考借鉴。
The installation of electromechanical equipment is an important sub-project of the subway construction project,and is related to the subsequent operation status of the subway infrastructure.Therefore,it is necessary to perform well in the construction management of the subway equipment installation operation.Based on this condition,this paper uses the case study method and selects a subway electromechanical equipment project as an example to carry out analysis,briefly summarizes the construction difficulties of the project,and further analyzes the key points of construction management of subway electromechanical equipment installation project from four perspectives:drawing review,BIM technology,organization management,and construction management,so as to provide reference for relevant industry technicians.
作者
朱俊浩
Zhu Jun-hao(China Railway 11th Bureau Group Electrical Engineering Co.,Ltd.,Wuhan 430074,Hubei Province,China)
出处
《科学与信息化》
2024年第3期111-113,共3页
Technology and Information
关键词
地铁工程
机电设备安装
施工管理
subway engineering
electromechanical equipment installation
construction management