以南充高坪机场改扩建施工为背景进行技术应用,结果表明:在场地不足的情况下,高空散装法是较优的安装方案;基于BIM的施工模拟,能够合理规划场地模型、提高施工效率;对施工全过程进行数值模拟力学分析,得出关键杆件与关键施工步,确保施工过程安全进行。
The technology is applied based on the renovation and expansion of Nanchong Gaoping Airport.Results showed that:the high bulk method is an optimal installation scheme in sufficient spaces;the BIM-based construction simulation is helpful to reasonably plan site models and improve the construction efficiency;and key bars and construction steps are obtained through numerical simulation and mechanical analysis of the whole construction process,to ensure the construction safety.