摘要
为了研究全断面隧道掘进机在城轨项目的适用性,通过查阅相关资料、调研相关案例,分析了全断面隧道掘进机应用于城市轨道交通中的优势和劣势,并分析始发、掘进、过站3方面因素对施工进度的影响。
In order to study the applicability and progress of tunnel boring machine in urban rail projects,the advantages and disadvantages of using tunnel boring machine in urban rail transit were analyzed by consulting relevant materials and researching relevant cases.The impact of three factors:departure,excavation,and station crossing on construction progress was also analyzed.
作者
杨守峰
YANG Shoufeng(China Railway Design Corpration,Tianjin 300308,China)
出处
《天津建设科技》
2024年第1期19-21,共3页
Tianjin Construction Science and Technology
关键词
全断面隧道掘进机
城轨项目
适用性
施工进度
tunnel boring machine
urban rail projects
applicability
construction progress