摘要 针对长春兴煤矿602工作面尾端揭露F_(5)断层时,顺槽及工作面围岩出现应力破坏现象,对断层区围岩采取“超前注浆+工字钢搭梁+梯形梁组合锚索棚”等联合支护技术。实际应用效果表明:支护优化后煤壁片帮深度降低至0.4 m,尾端头空顶面积减小至1.2 m^(2),顺槽顶板移近量为0.19 m,帮部移近量为0.23 m,顺槽围岩支护载荷控制在允许范围内,取得了显著应用成效。 In response to the stress failure phenomenon of the F_(5) fault exposed at the tail end of the 602 working face in Changchunxing Collery,the surrounding rock of entry and the working face is subjected to joint support technologies such as"advanced grouting,I-beam construction and trapezoidal beam combination anchor cable shed"for the surrounding rock in the fault area,whose actual application results show that after the optimization of support,the depth of coal wall fragmentation is reduced to 0.4 m,the empty roof area at the tail end is reduced to 1.2 m^(2),the convergence of entry roof and side is 0.19 m and 0.23 m,respectively,and the support load of entry surrounding rock is controlled within the allowable range,which achieves significant application results.
作者 徐瑞新 Xu Ruixin(Zuoyun Changchunxing Coal Industry Co.,Ltd.of Shanxi Coal Import and Export Group,Datong,Shanxi 037100)
出处 《江西煤炭科技》 2024年第2期18-20,23,共4页 Jiangxi Coal Science & Technology
关键词 综采工作面 过断层 围岩控制 支护优化 fully mechanized mining face crossing fault surrounding rock control support optimization
  • 相关文献

参考文献5

二级参考文献27

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部