期刊文献+

高速公路隧道机电设备安装方案与调试分析

Installation Scheme and Debugging Analysis of Electromechanical Equipment in Expressway Tunnel
下载PDF
导出
摘要 本文探究了高速公路隧道内摄像机、射流风机以及各类线缆的安装要点,并阐述了隧道机电系统的开通调试、多系统联合调试以及监控系统调试的具体方法。调试结果表明,隧道机电系统中各类机电设备可以正常开通,消防、照明等子系统可以实现联合运行,隧道内行车画面可通过宽屏显示器进行实时呈现,实现了高速公路隧道的可视化管理,对提升高速公路隧道的通行效率和确保车辆的安全运行有积极帮助。 This paper probes into the key points of installation of cameras,jet fans and various kinds of cables in expressway tunnels,and expounds the specific methods of commissioning and debugging of tunnel electromechanical system,multi-system joint debugging and monitoring system debugging.The debugging results show that all kinds of mechanical and electrical equipment in the tunnel electromechanical system can be opened normally,the subsystems such as fire fighting and lighting can be jointly operated,and the driving picture in the tunnel can be presented in real time through widescreen displays,which realizes the visual management of the highway tunnel,and has positive help to improve the traffic efficiency of the highway tunnel and ensure the safe operation of vehicles.
作者 郑莉 Zheng Li(Guangxi Intelligent Transportation Technology Co.,Ltd.,Nanning,China)
出处 《科学技术创新》 2024年第12期184-187,共4页 Scientific and Technological Innovation
关键词 高速公路 机电设备 射流风机 机电联动调试 expressway mechanical and electrical equipment jet fan electromechanical linkage debugging
  • 相关文献

参考文献5

二级参考文献28

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部