摘要 目的探讨基站空调在640层CT数据机房的使用效果。方法640层CT正常开机时,分别记录并比较基站空调和普通空调开启后数据机房温度由28℃降至24℃所需时间、正常运行必需后勤维护项目及次数、整体价格。结果室外温度为-5~30℃时,两种空调达到设定温度所需时间比较,差异无统计学意义(P>0.05),后勤维护项目次数相同;室外环境温度为31~42℃时,基站空调机房降温时间短于普通空调(P<0.05);普通空调需完成后勤维护项目一2次和项目二1次,基站空调需完成项目一2次;在室外环境温度为-6~-15℃时,普通空调故障停机,基站空调达到设定温度需要(12.4±1.5)min;基站空调整体价格高于普通空调;基站空调的整机性价比、操作使用、降温效率、故障报警和环境影响评分高于普通空调(P<0.05)。结论基站空调虽整体价格偏贵,但制冷速度快、可靠性高、维护简单,更适用于640层CT数据机房。 Objective To explore the use effect of base station air conditioning in the 640-layer CT data room.Methods When the 640 layer CT starts up normally,record the time required for the data center temperature to decrease from 28℃to 24℃after the base station air conditioning and ordinary air conditioning are turned on,under different outdoor environmental temperatures,the necessary logistics maintenance items and frequency for the normal operation of the two air conditioners,and the overall cost of the two air conditioners were recorded separately.Meanwhile,the benefits of using two types of air conditioners were analyzed from multiple dimensions.Results When the outdoor temperature was between-5~30℃,there was no statistically significant difference in the time required for the two air conditioners to reach the set temperature(P>0.05),and the number of logistics maintenance items was the same;When the outdoor ambient temperature was between 31~42℃,the cooling time of the base station air conditioning room was shorter than that of ordinary air conditioning(P<0.05);General air conditioning needed to complete logistic maintenance with twice Project 1 and once Project 2,and base station air conditioning needed to complete with twice Project 1;When the outdoor ambient temperature was between-6℃and-15℃,the ordinary air conditioner was shut down due to failure,and the base station air conditioner needed(12.4±1.5)minutes to reach the set temperature;The overall price of base station air conditioning was higher than that of ordinary air conditioning;However,the cost-effectiveness,operational use,cooling efficiency,fault alarm,and environmental impact score of the base station air conditioner were higher than those of ordinary air conditioners(P<0.05).Conclusion Although the overall price of base station air conditioning was relatively expensive,it had fast cooling speed,high reliability,and simple maintenance.In addition,it was more suitable for 640-layer CT data room.
作者 刘辉 赵冰 Liu Hui;Zhao Bing(Shaanxi Provincial People's Hospital,Xi'an Shaanxi 710068,China;Chencang Hospital,Baoji City,Baoji Shaanxi 721300,China)
出处 《医疗装备》 2024年第10期11-14,共4页 Medical Equipment
基金 陕西省创新能力支撑计划(2017KCT-36)。
关键词 640层CT 基站空调 数据机房 640-layer CT Base station air conditioning Data room
  • 相关文献

参考文献10

二级参考文献46

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部