基于高含水油田产出剖面测试与控制技术研究

Research on Production Prof ile Test and Control Technology Based on High Water-cut Oilf ield
下载PDF
导出
摘要 渤海油田水平井生产后期普遍存在高含水问题。为了控制油井过早见水,文章采用产液剖面测试与流量控制相结合的方式,在完井管柱中安装产液剖面测试短节和流入控制装置,对油井生产后期出水情况监测并进行流量控制。通过计算流体力学数值仿真方法,研究AICD控制装置对地层水、原油节流控制作用与机理。研究结果表明:AICD控制装置对地层水有强烈节流作用,过流阻力大,地层产出液减少;对原油的节流压降小,原油容易进入生产管柱,提高原油过流流量。某井现场应用情况,含水率呈持续下降态势,控水增油效果明显。 The problem of high water cut is common in the later stage of horizontal well production in Bohai oilf ield.In order to control the premature water occurrence of oil wells,this paper adopts the combination of liquid production prof ile test and flow control,and installs a liquid production prof ile test section and an inflow control device in the completion string to monitor and control the flow rate of water production in the later stage of oil well production.Through the numerical simulation method of computational fluid dynamics,the effect and mechanism of AICD control device on the throttling of formation water and crude oil were studied.The results show that the AICD control device has a strong throttling effect on the formation water,the overflow resistance is large,the formation production liquid is reduced,and the throttling pressure drop on the crude oil is small,and the crude oil is easy to enter the production string,which improves the flow rate of crude oil.In the f ield application of a well,the water cut showed a continuous downward trend,and the effect of water control and oil increase was obvious.
作者 刘晓龙 刘敏 王海龙 LIU Xiaolong;LIU Min;WANG Hailong(Engineering Technology Company,CNOOC Energy Technology&Services Limite,Tianjin 300452,China;Anton Bailin Oilfield Technology Co.,Ltd.,Beijing 102200,China)
出处 《化工管理》 2024年第19期78-81,共4页 Chemical Management
关键词 AICD控制装置 设计 数值模拟 AICD controls devise numerical simulation
  • 相关文献

参考文献8

二级参考文献90

  • 1汪志明,徐静,王小秋,王海平.水平井两相流变密度射孔模型研究[J].石油大学学报(自然科学版),2005,29(3):65-69. 被引量:23
  • 2郭大立.底水油藏中水平井的水锥问题[J].西南石油学院学报,1995,17(4):119-123. 被引量:19
  • 3WANG Z M, WEI J G, JIN H. Partition perforationoptimization for horizontal wells based on geneticalgorithms[R]. SPE 119833, 2011: 52-59.
  • 4IVAN V, LUMAY V G, RICARDO C, et al. Wellproduction enhancement results with Inflow ControlDevices (ICD) completions in horizontal well in Ecuador[R]. SPE 143431, 2011.
  • 5BERNT S A, GEIR H. Analysis of inflow control devices[R]. SPE 122824, 2009.
  • 6BREKKE K, LIEN S C. New and simple completionmethods for horizontal wells improve productionperformance in high-permeability thin oil zones[R].SPE 24762, 1994: 205-209.
  • 7JASON M V, NICHOLAS J C, MARTIN P C, et al.Examining erosion potential of various inflow controldevices to determine duration of performance[R]. SPE110667, 2007.
  • 8MARTIN P C, LUIS A G, RONNIE D R, et al. Newinflow control device reduces fluid viscosity sensitivityand maintains erosion resistance[R]. OTC 19811,2009.
  • 9LUIS A G, MARTIN P C, RONNIE D R, et al. The firstpassive inflow control device that maximizes productivityduring every phase of a well’s life[R]. IPTC 13863,2009.
  • 10KIM S Y, WIDAYAT S, RHANDY R, et al. Passiveinflow control devices and swellable packers controlwater production in fractured carbonate reservoir: acomparison with slotted liner completions[R]. SPE/IADC 140010, 2011.

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部