高速铁路简支箱梁施工方法选择及造价分析 被引量:1

Construction Techniques Selection and Cost Analysis of Simple-supported Box Girder in High-speed Railway
下载PDF
导出
摘要 我国高速铁路建设受制于征地拆迁及环境保护等影响,经常采用“以桥代路”形式,桥梁工程在线路中占比大,简支箱梁作为桥梁结构中的主要结构形式,越来越多应用于高铁建设中。本文对简支箱梁常用三种施工方法的施工工艺和适用条件进行了总结,并提出了综合造价确定方法,通过工程实例进行施工方案比选,为后续高速铁路简支箱梁施工组织设计提供思路。 The construction of high-speed railways in our country is often hindered by factors such as land acquisition,relocation,and environmental protection.As a result,the"bridge instead of road"approach is frequently employed,with bridge projects comprising a significant portion of the railway infrastructure.Among various bridge structures,the simply supported box girder has gained increasing prominence in high-speed rail construction.This study provides a comprehensive overview of three commonly used construction methods for simply supported box girders,including their construction processes and applicable conditions.Moreover,a holistic cost determination method is proposed,and a comparative analysis of construction plans is conducted using a specific project example.The findings of this study aim to offer valuable insights for the subsequent organizational design of simply supported box girder construction in high-speed railway projects.
作者 何聪 HE Cong(Engineering and Economy Department,China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,China)
出处 《铁路工程技术与经济》 2024年第4期47-51,62,共6页 Railway Engineering Technology and Economy
关键词 高速铁路 简支箱梁 施工方法 造价分析 high-speed railways simply supported box girders construction techniques cost analysis
  • 相关文献

参考文献7

二级参考文献16

共引文献24

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部