摘要
以某项具体的城市轨道交通站台板改造项目为案例,深入探讨实物量法在城市轨道交通改造工程成本分析阶段的实际应用,详尽阐述实物量法的应用流程。重点剖析在站台板整体降低施工过程中,关键工法与工序的详细情况,结合理论计算及现场数据收集,对关键分项工程的人工、材料、机械的使用进行深入分析。通过此分析,旨在准确确定站台板整体降低工程项目的成本估算指标,以确保估算编制的精确性。
Taking the platform slab reconstruction project of an urban rail transit station as an example,the practical application of physical quantity method in the cost analysis stage of urban rail transit reconstruction project is further discussed.The application process of physical quantity method is set forth in detail.The focuses are on the analysis of the details of the key construction methods and procedures in the overall lowering construction process of the platform slab.And combined with the theoretical calculation and field data collection,the use of labor,materials and machinery in the key sub-projects is further analyzed.Through this analysis,the purpose is to accurately determine the cost estimation index of the overall lowering project of the platform slab to ensure the accuracy of the estimation preparation.
出处
《城市道桥与防洪》
2024年第8期298-300,共3页
Urban Roads Bridges & Flood Control
关键词
轨道交通
车站站台板
整体降落
造价分析
rail transit
station platform slab
overall lowering
cost analysis