针对引进美国西屋公司、燃烧工程公司300MW/600MW级火电机组制造技术与美国依巴斯公司电站设计技术后的发电机容量与锅炉、汽轮机参数匹配问题,进行调查分析并提出意见。
Si nce the manufacturing technologies of300/600MW class generating units wer e introduced from US Westinghouse(WH)and Combustion Engineering(CE)corporati ons and the power plant design technologies were introduced from US Ebasco corp .,the matching issues between capacities of generators and parameters of boile rs and steam turbines had existed.This paper briefs the survey and analysis of the issues and suggestions raised.
出处
《中国电力》
CSCD
北大核心
2002年第12期7-11,共5页
Electric Power