摘要
废水处理工程运行调试是决定系统能否正常进行的重要环节。对系统运行过程存在的问题进行了分析 ,解决了调试过程中遇到的问题 ,对施工阶段可借鉴的经验进行了总结。
Working and adjusting of wastewater treatment project is the important link whether the system can work normally or not. The problems existed during the working process of the system are analyzed, the specifie problems incurred in the adjusting process are solved and the experience for reference during the construction stage is summarized.