期刊文献+

某机场航站楼试验区湿陷性黄土地基处理方案浅析

ANALYSIS OF TREATMENT SCHEME OF COLLAPSIBLE LOESS FOUNDATION FOR AN AIRPORT TERMINAL TEST AREA
原文传递
导出
摘要 结合某机场航站楼试验区湿陷性黄土地基处理设计方案,通过对初始方案调查研究,发现填料不均匀、施工面积偏小、施工时没有间歇时间等问题。结合现场检测成果,从填料预控、施工工艺规范化及试验检测等方面总结分析提出改良方案,对于提高工程质量、加快工程进度、确定施工参数、为后续施工提供依据具有非常重要的作用。 Combined with an airport terminal test area of collapsible loess foundation treatment experimental study,it was found that the filling was not uniform,the construction area was small,during construction without intermission time,combined with the detection results of field,the initial scheme investigation and study,from the filler pre-control,standardization of construction technology and other aspects of test summary and analysis,it was proposed the improvement scheme to improve the quality of the project,accelerate project plan and determine construction parameters,which provides the basis for subsequent construction.
出处 《工业建筑》 CSCD 北大核心 2014年第S1期653-654,共2页 Industrial Construction
关键词 湿陷性 黄土 试验 collapsible loess test
  • 相关文献

参考文献6

二级参考文献18

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部