大跨度PC斜拉桥施工控制中温度效应分析 被引量:21

Analysis of Temperature Influence on Long-span Prestress Concret Cable-stayed Bridge Construction Control
下载PDF
导出
摘要 从温度变化引起杆系结构的变形和受力特点出发 ,提出采用不同的多项式函数分区拟合结构温度场 ,并将温度变化等效成荷载计算温度变形的方法 ,经过实桥测试验证并与其它方法比较 ,本方法能够准确地计算施工控制中的温度影响 ,具有足够的工程精度。 In this paper, a method of eliminating the temperature influence is developed. Diverse polynominal functions are adopted to simulate the temperature change distribution in the girder with π shape cross section of Pc cable-stayed bridge. Based on the classical structure mechanics, the temperature deformation is transformed into equivalent load to calculate the structure reaction. By the verification of construction control in an actual bridge, the majority of temperature influence can be estimated and removed away with adequate precision.
出处 《公路交通科技》 CAS CSCD 北大核心 2002年第6期84-87,共4页 Journal of Highway and Transportation Research and Development
关键词 斜拉桥 施工控制 温度影响 Cable-stayed bridge Construction control Temperature influence
  • 相关文献

参考文献2

  • 1范立础.桥梁工程(上册)[M].北京:人民交通出版社,1986.320-327.
  • 2-.武汉市江汉四桥工程施工过程控制和施工监测关键技术研究课题研究报告[M].武汉:武汉市江汉四桥工程建设指挥部等单位,1999,12.45-51.

共引文献1

同被引文献80

引证文献21

二级引证文献180

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部