摘要
总结调试中出现的问题 ,研究了实际工作中与标准的差异 。
Something has gone wrong with adjustion and testing is summaried. In practice work is different from standard is found. To solve problems methods are put forword.
出处
《江西电力》
2002年第6期15-20,共6页
Jiangxi Electric Power
关键词
入炉煤
机械采制样装置
调试
火电厂
thermal power plant
input coal to boiler
machine smapling device
adjust and test
method