摘要
通过对焦炭塔进料结构的优化,解决了出焦口法兰密封面泄漏的问题,局部优化后,焦炭塔重新投入生产,该部位运行良好,未出现泄漏。
By performing the optimization of inlet structure in coke tower, the problem of leakage in flange at coke outlet was solved. After being this local optimization, the leakage has never been occurred in the flange when the tower is put into production again.
出处
《化工设备与管道》
CAS
2015年第4期25-26,共2页
Process Equipment & Piping
关键词
焦炭塔
出焦口泄漏
进料方式
coke tower
leakage at coke outlet
feeding form