摘要
对于某水电站左岸船闸高边坡的治理 ,在详尽的地质勘探工作的基础上 ,制定了高边坡治理设计方案 ,实施动态监控设计和信息化施工 ,保证了边坡稳定 ,使船闸如期建成运行 .
Based on the detailed geological prospecting work,dynamic monitoring design and informational construction has been carried out in one power plant,which ensure the stability of slope and the completion and operation of ship lock as scheduled .The stability evaluation and improvement problem of artificial high slope on complex creep loosed rock mass are solved firstly.
出处
《华北水利水电学院学报》
2002年第4期26-29,共4页
North China Institute of Water Conservancy and Hydroelectric Power
关键词
水电工程
高边坡
变形机理
监控
high slope
deformation mechanism
stability analysis
improvement
monitoring