摘要
以华能长兴电厂为例,介绍该厂两台汽动引风机通过转速进行并列的不同方法,并通过经济性、安全性、操作复杂性及引风机工作汽源等的比较,分析了两种并列方法各自的优缺点及注意事项,提出了新的汽动引风机并列方案.
Taking Changxing Power Plant of Huaneng Power International,INC.as an example,the different methods of balancing speed of two steam induced draught fan in this factory are introduced,and this comparison was made from the perspectives of economy,safety,complexity of operation and working air source of induced draft fan to analyze the advantages,disadvantages and precautions of two parallel methods,thus a new kind of parallel scheme of the steam engine is proposed.
作者
沈霄华
董先平
施宇
秦涛
廖红涛
SHEN Xiaohua;DONG Xianping;SHI Yu;QIN Tao;LIAO Hongtao(Changxing Power Plant of Huaneng International,INC.,Changxing 313100,China)
出处
《湖州师范学院学报》
2019年第2期68-72,共5页
Journal of Huzhou University
关键词
汽动引风机
转速
并列
汽源
steam induced draught fan
speed
parallel
working air source