摘要
分析了我国现行的招投标计价模式及其弊端 ,阐述了采用工程量清单报价的工程招标方式的思路和现实意义 ,以使我国工程造价管理尽快与国际接轨。
In this paper, our country present bidding quotation mode and some existed problems are analyzed. To make our country engineering cost management adapt international situation as soon as possible the practical significance and idea of adopting engineering quantity list quotation mode in bidding are clarified.
出处
《山西建筑》
2003年第1期165-166,共2页
Shanxi Architecture
关键词
招投标
计价模式
工程量清单
量价分离
bidding, quotation mode, engineering quantity list, a method severed cost form quality